| WALL HUNG BASIN |
 |
As shown in the picture, the rag bolt must be grouted into the cement/concrete wall. The bolts must be fixed to the cement/concrete wall. Allow setting and checking than install it using nut and washer. |
|
|
|
|
 |
|
 |
| |
| COUNTER WASH BASIN |
| |
At the beginning |
| |
| 1. |
A skilled or experienced person should install counter lavatories. |
| 2. |
Avoid using adhesive with this product. |
| 3. |
Check the waste area and supply tubing if required. |
| 4. |
Do not open the lavatory from its protective carton untill you are ready for installation. |
| 5. |
Please follow all local building and plumbing codes. |
|
|
|
|
|
 |
|
 |
| |
| MATERIALS & TOOLS |
 |
Measure tape, Keyhole or saber saw, Hammer, Glasses, Rags or paper toweling, Drill (1/2 dia, drill bit or larger), Pencil, Sealant, Sharp Knife or Scissors. |
|
|
|
|
 |
|
|
|